How to get Study Material for the Microsoft 70-497 Certification

Question NO : 12

You are a managing test cases by using Microsoft Test Manager (MTM). You create a new configuration. You need to select the new configuration for all test cases in a test suite. What are two possible ways to achieve this goal? (Each correct answer presents a complete solution. Choose two.)

A. Select the new configuration as the default configuration for the test suite.
B. Select the test suite and use Configurations to select the new configuration for the test suite.
C. Select all of the test cases in the test suite and use Configurations to select the new configuration for the selected tests.
D. Select the test suite and use Select test configurations for all tests to select the new configuration.

Answer: A,B 

Monday 4 June 2018

Free 70-497 Exam Dumps - 70-497 Certifications - Dumps4Download.in

Question NO : 11

You are using Microsoft Test Manager (MTM) to run manual tests. Testers reported a bug during a
test run on the V1.0 build. A build for V2.0 has been created. Testers are still running tests against
the V1.0 build. You need to verify that the bug has been fixed in build V2.0. What should you do?

A. Change the default build for the test plan to V2.0 and run the test case.
B. Run the test case with default settings; the latest build will be selected automatically.
C. Change the build to V2.0 by using Run with options and run the test case.
D. Change the build property for the test case to the V2.0 build and run the test case.

Answer: A 

Friday 2 March 2018

Latest Microsoft 70-497 Practice Test | Microsoft 70-497 Dumps

Question No:1

You are using Microsoft Visual Studio 2012. A requirement has been removed and you need to update the five corresponding test cases to reflect this by changing their state. You need to simultaneously update the state of these five test cases. What are two possible ways to accomplish this goal? (Each correct answer presents a complete solution. Choose two.)

A. In Team Explorer, run a query that returns the five test cases. In the Results pane, highlight all five
test cases and click Refresh.
B. In MTM, run a query that returns the five test cases. In the Results pane, highlight all five test
cases and click Run.
C. Navigate to Web Access, run the query that returns the five test cases, select the five test cases,and edit selected work items.
D. In Microsoft Excel, open a query that returns the five test cases. Update the State field of all of the work items. Click Publish.
E. In Team Explorer, run a query that returns the five test cases. In the Results pane, update the state and save each test case.

Answer: B,E 

Question No:2

You are using Microsoft Test Manager (MTM). You are using the Microsoft Solution Framework (MSF) for Agile Software Development process template. Your team has all required permissions to run the reports on the SharePoint project portal. You need to track the progress on resolving bugs by your team for the past week. Which Excel report should you run?

A. Bug Trends
B. Bugs by Assignment
C. Run the Team Trend report.
D. Bug Progress

Answer: A 


Microsoft Free 70-497 Dumps To Get Desired Results In  70-497 Exam

Question No:3

You are using Microsoft Test Manager (MTM) to manage your testing efforts. You plan to use the Recommended tests feature to assist in identifying tests to run against a Windows Presentation Foundation rich client application. When you select a new build, no recommended tests are displayed. You need to configure the data collectors to enable the feature. Which data collector should you configure?

A. Action Log
B. Test Impact
C. IntelliTrace
D. ASP.NET Client Proxy for IntelliTrace and Test Impact

Answer: B 

Question No:4

You are using Microsoft Test Manager (MTM) to perform exploratory testing. You need to insert an image into the comment area for the test run. What are two possible ways to accomplish this goal? (Each correct answer presents a complete solution. Choose two.)

A. Use the Add screenshot tool in the exploratory test runner and drag the selection box over the area of the screen you want to capture.
B. Capture the image you want to insert by using your favorite screen capture utility and paste the image into the comment area of the exploratory testing window.
C. Capture the image you want to insert by using your favorite screen capture utility and save the file to disk. Add the image as an attachment to the test run.
D. Capture the image you want to insert by using your favorite screen capture utility. Drag and drophe file onto the comment area from the Windows Explorer.

Answer: A,C


Free  70-497 Dumps - Pass Microsoft  70-497Exam - Dumps4download



Question No:5

You are running a manual test using Microsoft Test Manager (MTM). You have chosen to create an action recording. You want to pause the test run and exit the test runner. Before you exit the test runner, you need to mark the test case as being in progress. Which action should you perform in the test runner?

A. Close
B. Return to Testing Center
C. Save
D. Save and Close

Answer: B      

Question No:6

You are using Microsoft Test Manager (MTM) to run an automated test suite with 240 long-running tests. In your test environment, you have set up four client machines to run these tests. You have assigned the Client role to all four machines. You need to make sure that when you run the test suite, the tests are distributed equally over all four client machines. What should you do?

A. Add an even amount of RAM to all four machines.
B. In the Test Controller Manager view, change the distribution property for the test controller to 4.
C. In the Content view, configure the test suite to use all four environments.
D. In the Test Controller Manager view, change the Weighting property for all four test agents to 60.

Answer: D

Verified May Microsoft  70-497 Dumps - Dumps4Download.in


Question No:7

You are using Microsoft Test Manager (MTM). You are using the Microsoft Solution Framework (MSF) for Agile Software Development process template. Your TFS environment includes SharePoint Server 2010 Enterprise Edition and reporting integration. You need to identify the number of bugs that are open and assigned to you. What should you do?

A. Open the Track tab in MTM and click the My Assigned Bugs link.
B. Open the Bugs Dashboard and view the Bug Progress report.
C. Open a Visual Studio 2012 Command prompt and run the ActiveBugList.exe command, pasting in username as a parameter.
D. Open the Bugs Dashboard and view the Active Bugs by Assignment report.

Answer: D 

Question No:8

You use Microsoft Test Manager (MTM) to manage your test environments. You plan to test an ASP.NET website on various topologies (such as one-tier, two-tier, three-tier, and n-tier) to ensure that the website supports scalability. You need to be able to deploy copies of predefined environments based on templates. What should you do?

A. Create a System Center Virtual Machine Manager (SCVMM) environment for each topology and store them in the library. Use the library to deploy new environments.
B. Create new standard environments with physical machines.
C. Create new physical environments using physical machines.
D. Create new standard environments with machines that run under System Center Virtual Machine Manager (SCVMM).

Answer: A 

Dumps4download Microsoft Free  70-497 Dumps |  70-497 Exam Question

Question No:9

You are using Microsoft Test Manager (MTM) to manage test cases. You want to review all test cases with shared steps. You need to build a direct links query that will generate a list of all test cases in the team project that use a shared step. Which three actions should you perform? (Each correct answer presents part of the solution. Choose three.)

A. Set the linked work items filter to Work item type = Shared Steps.
B. Set the main query to Team Project = @Project AND Work Item Type = Test Case.
C. Return all top-level work items.
D. Return only items that have the specified links.
E. Return only items that do not have the specified links.

Answer: A,B,D 

Question No:10

You are using Microsoft Test Manager (MTM) to run manual tests. Testers reported a bug during a test run on the V1.0 build. A build for V2.0 has been created. Testers are still running tests against the V1.0 build. You need to verify that the bug has been fixed in build V2.0. What should you do?

A. Change the default build for the test plan to V2.0 and run the test case.
B. Run the test case with default settings; the latest build will be selected automatically.
C. Change the build to V2.0 by using Run with options and run the test case.
D. Change the build property for the test case to the V2.0 build and run the test case.

Answer: A